Stadia Magazine
  • News
    • A-E
      • Architecture & Design
      • Audio Systems
      • Branding, Broadcasting & Naming Rights
      • Broadcasting Infrastructure
      • Catering & Concessions
      • Communications Infrastructure
      • Engineering & Construction
    • F-N
      • Field Lighting
      • Floorings & Protective Coatings
      • IT Systems Integration
      • Naming Rights
      • Natural Turf
      • New Project
    • O-R
      • Off-Pitch Lighting
      • Renovation & Refurbishment
      • Retail & Entertainment Design
      • Roofing Materials & Technologies
    • S-Z
      • Screens & Visual Displays
      • Seating, Luxury Suites & Premium Seats
      • Security, Ticketing & Access Control
      • Sports Surfaces
      • Stadium Sustainability
      • Synthetic Turf
      • Tournament Venue
  • Features
  • Online Magazines
    • March 2025
    • October 2023
    • March 2023
    • October 2022
    • Archive Issues
    • Subscribe Free!
  • Opinion
  • Videos
  • Podcast
  • Webinars
  • Supplier Spotlight
  • Jobs
    • Browse Industry Jobs
    • Post a Job – It’s FREE!
    • Manage Jobs (Employers)
LinkedIn YouTube X (Twitter)
LinkedIn
Subscribe to Magazine Subscribe to Email Newsletter Media Pack
Stadia Magazine
  • News
      • Architecture & Design
      • Audio Systems
      • Branding, Broadcasting & Naming Rights
      • Broadcasting Infrastructure
      • Catering & Concessions
      • Communications Infrastructure
      • Engineering & Construction
      • Field Lighting
      • Floorings & Protective Coatings
      • IT Systems Integration
      • Naming Rights
      • Natural Turf
      • New Project
      • Off-Pitch Lighting
      • Renovation & Refurbishment
      • Retail & Entertainment Design
      • Roofing Materials & Technologies
      • Screens & Visual Displays
      • Seating, Luxury Suites & Premium Seats
      • Security, Ticketing & Access Control
      • Sports Surfaces
      • Stadium Sustainability
      • Synthetic Turf
      • Tournament Venue
  • Features
  • Online Magazines
    1. March 2025
    2. October 2023
    3. March 2023
    4. October 2022
    5. Archive Issues
    6. Subscribe Free!
    Featured
    31st March 2025

    March 2025 issue is out NOW!

    Online Magazines By Saul Wordsworth
    Recent

    March 2025 issue is out NOW!

    31st March 2025

    October 2024 issue is out NOW!

    28th October 2024

    In this Issue – March 2024

    9th April 2024
  • Opinion
  • Videos
  • Podcast
  • Webinars
  • Supplier Spotlight
  • Jobs
    • Browse Industry Jobs
    • Post a Job – It’s FREE!
    • Manage Jobs (Employers)
LinkedIn YouTube
Stadia Magazine
Audio Systems

Audio system install at Al Janoub Stadium for Qatar 2022 World Cup

Web TeamBy Web Team19th March 20204 Mins Read
Share LinkedIn Twitter Facebook Email
Al Janoub Stadium

The Al Janoub Stadium, sited in a brand-new urban district and community hub of Al Wakrah, Qatar, was one of the first stadiums commissioned for the 2022 FIFA World Cup. Audio experts L-Acoustics reveals what it was like to design an audio system for the dual-purpose venue.

The stadium feature flowing architecture that draws inspiration from the city’s cultural and maritime history and includes a distinctive and dominant roof that architect Zaha Hadid says was inspired by the region’s traditional ‘dhow’ pearl fishing boats.

Al Janoub has been designed to be used in two distinct ‘modes’. Until the end of the World Cup tournament it will have a seating capacity of 40,000. After that, the number of seats will be halved, and the venue will become the home ground for Al Wakrah Sport Club.

Al Janoub Stadium

Infrastructure specialist AECOM was lead consultant on the project, with acoustic design and rigging, installation and integration by Black Arrow. Antoine Saab, the AV division head at Black Arrow and his team worked hard on identifying the right solution that would meet the intended FIFA standards. L-Acoustics was chosen for this ambitious structure’s sound reinforcement system, and both Peter Owen, sales manager at L-Acoustics, Antoine Saab and the Black Arrow teams worked closely with the stakeholders to design an optimum package that would not only meet FIFA standards but also enhanced performance expectations for legacy use after the tournament.

 

According to L-Acoustics’ Tom Williams, application manager, sports facilities and Julien Laval, application manager and consultant liaison, the dual-purpose World Cup / legacy aspect was one of the big challenges at the design phase. “We needed two independent designs to fit the two configurations,” says Laval. “And then these had to be combined into one.”

Al Janoub Stadium

The team arrived at the initial designs using L-Acoustics Soundvision 3D acoustical simulation software. “Soundvision was very useful for working out the mechanical limits and audio performances simultaneously, to find the optimum design in free field conditions,” says Laval. “Once the design version was ready, it was tested using the consultant’s room model in order to predict if the solution was meeting their requirements in terms of SPL and Intelligibility.”

The Stadium PA system uses two distinct rigging structures. One is a lower ring that runs all the way around the space, just in front of the seating areas. The other consists of two long arcs that bridge the length of the stadium on either side.

Al Janoub Stadium

The main system is composed of hangs of eight Kara with SB18 subs as well as ARCS II corner fills at either end of the stadium to cover the lower ring, augmented by hangs of 12 Kara and SB18 subs at the center and two ends of the long sides on the upper arc. This will also become the legacy configuration. Additional ARCS WiFo and X12 hangs on the lower ring cover the upper seating areas exclusively for the World Cup configuration.

According to Laval, this project benefited from a particularly successful engineering dialogue between the consultants, contractors and L-Acoustics, in order to constantly follow and allow for updates to the project through various phases. “L-Acoustics also provided a lot of support through the installation phase to BlackArrow and Animative,” he notes. “The client was very happy with what we achieved.”

Still two years away from fulfilling its primary function, the Al Janoub Stadium development also includes a multipurpose sports complex with swimming pools and spas, as well as a shopping center. Additional infrastructure planned in the near future include athletics facilities, a school, gym, and lots more – all contributing to a successful story before, during, and after the World Cup.

The Stadium had its inaugural football match on March 16th 2019, between Al Sadd and Al Duhail for the Amir Cup final. There is lots more football left to be played, and L-Acoustics is proud to be chosen for such a prestigious and high-profile project.

Share. Twitter LinkedIn Facebook Email
Previous ArticleMSG Sphere Las Vegas construction update images
Next Article LA Rams star Aaron Donald tours new SoFi Stadium construction progress
Web Team

Related Posts

Audio Systems

NBA’s Miami Heat chooses L-Acoustics to enhance game-day experience

12th June 20253 Mins Read
Features

FEATURE: How to optimize stadium revenue

7th May 20258 Mins Read
Features

FEATURE: The world’s largest sports stadiums revealed

19th March 20253 Mins Read
Latest Posts

Malaysia offers first glimpse of Shah Alam Sports Complex

12th June 2025

NBA’s Miami Heat chooses L-Acoustics to enhance game-day experience

12th June 2025

Oakland Athletic sets date for breaking ground on new $1.75b Vegas stadium

12th June 2025
Supplier Spotlights
Our Social Channels
  • LinkedIn
Getting in Touch
  • Weekly News Emails
  • Meet the Editors
  • Contact Us
  • Media Pack
Related Topics
  • Auditoria
FREE WEEKLY NEWS EMAIL!

Get the 'best of the week' from this website direct to your inbox every Tuesday


© 2023 Mark Allen Group Ltd | All Rights Reserved
  • Cookie Policy
  • Privacy Policy
  • Terms & Conditions

Type above and press Enter to search. Press Esc to cancel.